Daleway Park Aquatic Playground
Description:
This project will renovate the existing spray pool in Daleway Neighborhood Park, which was acquired and developed with IAC/LWCF funding in 1969 and 1971. The 35-year-old spray pool needs to be replaced as it does not meet current safety and accessibility standards. The existing concrete surfacing is cracking; elevated concrete structures are hard, slippery and dangerous; concrete curbing limits accessibility; constant maintenance is required; and there are potential liability hazards. In spite of its deteriorating condition, this spray pool is wildly popular in the summer. Daleway Park is a neighborhood park located in a residential neighborhood, however the spray pool serves the entire west half of Lynnwood, a population of approximately 15,000. (Another spray pool at North Lynnwood Park serves the east half of the city.) During the summer months, the spray pool is heavily used with an estimated 100-150 users per week. Birthday parties, summer camps & family outings are planned around it every weekend. An innovative and thematic new aquatic playground has been designed to replace the existing spray pool to increase playability, improve safety and access. High quality and low maintenance materials will be installed. The aquatic elements are ground-related, programmable for interactive use and designed for all ages. A new in-ground system will replace existing outdated equipment that is in constant need of repair. The new aquatic playground will be completely ADA friendly and compliant.
-
Daleway Park Aquatic Playground
-
This project will renovate the existing spray pool in Daleway Neighborhood Park, which was acquired and developed with IAC/LWCF funding in 1969 and 1971. The 35-year-old spray pool needs to be replaced as it does not meet current safety and accessibility standards. The existing concrete surfacing is cracking; elevated concrete structures are hard, slippery and dangerous; concrete curbing limits accessibility; constant maintenance is required; and there are potential liability hazards. In spite of its deteriorating condition, this spray pool is wildly popular in the summer. Daleway Park is a neighborhood park located in a residential neighborhood, however the spray pool serves the entire west half of Lynnwood, a population of approximately 15,000. (Another spray pool at North Lynnwood Park serves the east half of the city.) During the summer months, the spray pool is heavily used with an estimated 100-150 users per week. Birthday parties, summer camps & family outings are planned around it every weekend. An innovative and thematic new aquatic playground has been designed to replace the existing spray pool to increase playability, improve safety and access. High quality and low maintenance materials will be installed. The aquatic elements are ground-related, programmable for interactive use and designed for all ages. A new in-ground system will replace existing outdated equipment that is in constant need of repair. The new aquatic playground will be completely ADA friendly and compliant.
- 47.83 -122.32
Daleway Park - I-5 to Exit 181A. Left on 44th Ave W. Left on 188th St SW Left on 64th Ave W Daleway Park is on left at 19015 64th Ave W Tutmark Hill Park - Take I-5 north from Seattle Take the 164TH ST SW exit - exit #183 Turn right onto 164TH ST SW Turn right onto LARCH WAY Turn right onto 178TH ST SW (MAPLE ROAD) To 1414 and 1320 178th ST SW on the right

