Bear Creek Park Trail Development
Description:
This project is the development of approximately 2325 linear feet of multi-use trail within Bear Creek Park. This project will link the existing trail underpass at Union Hill Road with Redmond Way. A trail crossing light is currently under design by the City. The trail will then tie into the existing trail constructed at Town Center which links to the Sammamish River Trail. This project is a phase of the Bear & Evans Creek Trail & Greenway, a trail system that connects to four regional trails and provides looped trails around the City of Redmond.
-
Bear Creek Park Trail Development
-
This project is the development of approximately 2325 linear feet of multi-use trail within Bear Creek Park. This project will link the existing trail underpass at Union Hill Road with Redmond Way. A trail crossing light is currently under design by the City. The trail will then tie into the existing trail constructed at Town Center which links to the Sammamish River Trail. This project is a phase of the Bear & Evans Creek Trail & Greenway, a trail system that connects to four regional trails and provides looped trails around the City of Redmond.
- 47.67 -122.11
From the end of SR 520 at Redmond Way, turn left (east) to the first shopping center, approximately 500 feet. Turn right (north). Bear Creek Park is located east of the shops (Safeway, etc).

